Front-End Engineering Design (FEED)

Photo
13.02.2023 • News

Linde Wins Equinor’s H2H FEED Contract

The year 2023 has started on a busy note for Linde’s plant engineering arm. For starters, Norwegian energy group Equinor has awarded the company a Front-End Engineering Design (FEED) contract for its H2H (Hydrogen to Humber) project in northeast England.

Photo
08.02.2023 • News

Lotte Ineos to Build Third VAM Plant in Korea

Lotte Ineos Chemical, a joint venture of South Korea’s Lotte Chemical and UK-managed Ineos, has announced plans to increase overall production capacity for vinyl acetate monomer (VAM) to 700,000 t/y from 450,000 t/y currently.

Virtual Event

Digitalization in the Chemical Industry
CHEManager Spotlight

Digitalization in the Chemical Industry

Save the Date: October 22, 2025
The event will be promoted to a combined audience of over 100,000 professionals across Europe through the CHEManager and CITplus networks.