29.08.2012 • News

ThyssenKrupp Wins Plant Construction Contract From Russia

The ThyssenKrupp plant construction business won a front-end engineering and design (FEED) contract for a single-train polypropylene plant. The plant will be built for ZapSibNeftechim, a wholly owned subsidiary of Sibur, the biggest Russian gas processing and petrochemicals group. The plant, which will have a design capacity of 500,000 t/year, is to be built in Tobolsk, Tyumen Region, in West Siberia. The permitting for the contract will be carried out by the local company OOO Uhde during contract execution.

The polypropylene plant will be based on LyondellBasell's Spheripol process, the most widely used technology for the production of polypropylene. The Tobolsk plant will produce a wide range of polypropylene brands for use, for example, in textile and packaging applications as well as in the production of automotive body parts and consumer goods.

 

Interview

Navigating Uncertainty and Driving Innovation
Meeting Pharma’s Demand for Speed, Reliability, and Flexibility

Navigating Uncertainty and Driving Innovation

Axplora CCO Arul Ramadurai discusses navigating industry uncertainty, building strategic partnerships, and advancing flexible pharmaceutical manufacturing

Expert Insights

ADCs for Precision Cancer Therapy
Comprehensive Insights into Antibody–Drug Conjugates

ADCs for Precision Cancer Therapy

Explore how antibody-drug conjugates are reshaping precision cancer therapy and discover what it takes to successfully develop, manufacture, and scale these complex biologics.

most read